Merge pull request #3217 from weaveworks/improve-test-readme
Improve instructions for running tests against a remote cluster
This commit is contained in:
1 file changed
+79
-1
+79
-1
@@ -13,7 +13,7 @@ it is recommended to run the tests from the build VM and not the host.
|
||||
|
||||
> **NOTE WELL** The number of hosts required by a test must be specified in the test name. For example, `000_some_test.sh` will use one host, while `001_some_other_3_test.sh` will use three hosts. The number of hosts must be the last part of the test name before the `_test.sh` prefix. See `/tools/runner/runner.go` for details
|
||||
|
||||
## Running tests
|
||||
## Running tests locally using VMs
|
||||
|
||||
**TL;DR**: You can run the steps 2. to 7. below with one command:
|
||||
|
||||
@@ -23,46 +23,62 @@ it is recommended to run the tests from the build VM and not the host.
|
||||
|
||||
1. Start the build virtual machine (see above article for more details):
|
||||
|
||||
```
|
||||
vagrant up
|
||||
```
|
||||
|
||||
2. Start the three testing VMs:
|
||||
|
||||
```
|
||||
cd test
|
||||
vagrant up
|
||||
```
|
||||
|
||||
3. SSH into the build VM and go to Weave Net's sources:
|
||||
|
||||
```
|
||||
cd ..
|
||||
vagrant ssh
|
||||
# you are now on the build VM:
|
||||
cd ~/weave
|
||||
```
|
||||
|
||||
4. Compile all code and dependencies:
|
||||
|
||||
```
|
||||
make
|
||||
make testrunner
|
||||
cd test
|
||||
```
|
||||
|
||||
5. Upload the weave images from where the `Makefile` puts them (`weave.tar.gz`) to
|
||||
the three docker hosts, `docker load` these, and copies the `weave` script over:
|
||||
|
||||
```
|
||||
./setup.sh
|
||||
```
|
||||
|
||||
6. Run individual tests, e.g.:
|
||||
|
||||
```
|
||||
./200_dns_test.sh
|
||||
```
|
||||
|
||||
or run all tests (everything named `*_test.sh`):
|
||||
|
||||
```
|
||||
./run_all.sh
|
||||
```
|
||||
|
||||
7. Stop all VMs:
|
||||
|
||||
```
|
||||
exit
|
||||
# you are now on your host machine
|
||||
vagrant destroy -f
|
||||
cd test
|
||||
vagrant destroy -f
|
||||
```
|
||||
|
||||
|
||||
## Using other VMs
|
||||
@@ -92,3 +108,65 @@ When a new version of Docker is released, you willneed to update the GCE test im
|
||||
To do this, change the Docker version in `run-integration-tests.sh` and push the change.
|
||||
Next build in CircleCI will detect that there is no template for this version of Docker and will first create the template before running tests.
|
||||
Subsequent builds will then simply re-use the template.
|
||||
|
||||
## Running the tests on a cloud provider
|
||||
|
||||
Running the tests against a remote provider instead of local vagrant VMs is a little more involved, and reproduces the environment used for CI. It is recommended that you use the build VM to coordinate the build phase. Make sure you have a recent version of [ansible](https://github.com/ansible/ansible) installed, terraform will fail to provision the VMs.
|
||||
|
||||
1. Create the build VM in the repository root and log in
|
||||
|
||||
```
|
||||
# On your development machine
|
||||
$ vagrant up
|
||||
$ vagrant ssh
|
||||
```
|
||||
|
||||
2. Once in the build vm, install the `gcloud` tools as [per the documentation](https://cloud.google.com/sdk/downloads). You need to do this manually as the circleCI VMs are already provisioned with `gcloud`.
|
||||
|
||||
```
|
||||
# On the build VM
|
||||
$ curl https://sdk.cloud.google.com | bash
|
||||
$ exec -l $SHELL
|
||||
```
|
||||
|
||||
You don't need to initialise the `gcloud` tools by running `gcloud init`.
|
||||
|
||||
3. Export the secret key needed to decrypt the cloud credentials - This assumes you're using the build tools
|
||||
|
||||
```
|
||||
# On the build VM
|
||||
$ export SECRET_KEY="XXXXXXXXXX"
|
||||
```
|
||||
|
||||
4. Navigate to the test directory and provision the VMs
|
||||
|
||||
```
|
||||
# On the build VM
|
||||
$ cd weave/test
|
||||
/weave/test$ ./run-integration-tests.sh up
|
||||
```
|
||||
5. Run the tests you need
|
||||
|
||||
```
|
||||
# On the build VM
|
||||
/weave/test$ export TESTS="./090_docker_restart_policy_2_test.sh"
|
||||
/weave/test$ ./run-integration-tests.sh test
|
||||
```
|
||||
|
||||
6. Don't forget to close down your remote VMs when you're done
|
||||
|
||||
```
|
||||
# On the build VM
|
||||
/weave/test$ ./run-integration-tests.sh destroy
|
||||
```
|
||||
|
||||
7. And switch off your build VM
|
||||
|
||||
```
|
||||
# On the build VM
|
||||
/weave/test$ exit
|
||||
|
||||
# On your development machine
|
||||
$ vagrant destroy -f
|
||||
# or "vagrant suspend" if you want to preserve the machine state
|
||||
```
|
||||
Reference in new issue
Block a user